Multi-purpose plant for fine chemical production

Fine chemistry multi-purpose plant with stirring tank, centrifuge, dryer, rectification (corrosion resistant).


Customer
CABB AG
Site
Pratteln, Switzerland
Total invest
32 Mio. CHF
Duration
2012 – 2014
Contract type
General planner
Services
  • Project management
  • Concept planning incl. cost estimation
  • Basic Design: Process engineering, infrastructure, construction incl. statics, instrumentation
  • Risk analyses
  • Procurement: tendering, expediting, FATs
  • Detail design (CAD 3D), stress calculation
  • Construction management
  • Commissioning support
     