People flow, material flow, logistics. The GMP-compliant design of buildings such as clean rooms, laboratories and production areas requires interdisciplinary planning and comprehensive knowledge of the production process. Whether a conversion during ongoing operations or a new build on a greenfield site, we plan the complex framework conditions for processes and operating procedures in a GxP-regulated environment right from the start. All parts of the building are designed and logistically connected accordingly.
Building Information Modeling (BIM) enables integrated, digital planning and the joint work of all planners on one building model. This offers decisive advantages for your project:
Planning must be carried out across all disciplines and take the production process fully into account, including the flow of people, the flow of materials and logistics. Chemgineering incorporates these framework conditions from the outset, both for refurbishments whilst operations are ongoing and for new builds on a greenfield site.
BIM is an integrated, digital design method in which all designers work on a shared building model. Chemgineering cites the following benefits: better decision-making through the simulation and visualisation of different options; earlier certainty regarding costs and deadlines; transparent planning; and comprehensive documentation.
Among other things, Chemgineering designs production and manufacturing facilities, cleanrooms, laboratories, storage and logistics areas, as well as hospital pharmacies. All these buildings are designed in accordance with GxP requirements.
We help you to successfully implement your project.
With professional support in building design. Get in touch with us.